The client’s complaints were related to high noise levels from the neighbors on the floor above. Half of the apartment was located beneath an area occupied by a terrace, while the other half was under a living room. The client requested an on-site inspection and asked us to propose the best solution to address the problem, specifying that soundproofing should be carried out throughout the entire apartment. Additionally, the client required the entire renovation to be completed within one week, as the property was occupied.


